Jump to content

Featured Replies

Posted

On the Article detail page, there are 2 tabs for Reviews and Comments.

Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates?

There are rarely any reviews compared to comments and the ordering of these tabs is not optimal.

Edited by WebCMS

  • Community Expert

The only way in which to do this would be through customisation. There is no specific setting for this

  • Community Expert
2 hours ago, WebCMS said:

Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates?

I may have a plugin for this matter. Will reply back later.

  • Community Expert
On 1/11/2024 at 3:14 AM, WebCMS said:

On the Article detail page, there are 2 tabs for Reviews and Comments.

Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates?

There are rarely any reviews compared to comments and the ordering of these tabs is not optimal.

 

On 1/11/2024 at 6:05 AM, Adriano Faria said:

I may have a plugin for this matter. Will reply back later.

https://www.sosinvision.com.br/index.php?/file/307-pages-commentsreviews-tab-order/

  • Author
On 1/15/2024 at 5:33 AM, Adriano Faria said:

It downloaded in XML format. When I tar it on macOS and try to install -

1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it.

  • Community Expert
Just now, WebCMS said:

It downloaded in XML format. When I tar it on macOS and try to install -

1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it.

As stated in the file description, it’s a plugin

  • Author
1 hour ago, Adriano Faria said:

As stated in the file description, it’s a plugin

Got it. Thanks.

Installed the first plugin ever 😀

Recently Browsing 0

  • No registered users viewing this page.