Jump to content

Change order of tabs on Article detail page


WebCMS

Recommended Posts

On the Article detail page, there are 2 tabs for Reviews and Comments.

Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates?

There are rarely any reviews compared to comments and the ordering of these tabs is not optimal.

Edited by WebCMS
Link to comment
Share on other sites

On 1/11/2024 at 3:14 AM, WebCMS said:

On the Article detail page, there are 2 tabs for Reviews and Comments.

Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates?

There are rarely any reviews compared to comments and the ordering of these tabs is not optimal.

 

On 1/11/2024 at 6:05 AM, Adriano Faria said:

I may have a plugin for this matter. Will reply back later.

https://www.sosinvision.com.br/index.php?/file/307-pages-commentsreviews-tab-order/

Link to comment
Share on other sites

On 1/15/2024 at 5:33 AM, Adriano Faria said:

It downloaded in XML format. When I tar it on macOS and try to install -

1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it.

Link to comment
Share on other sites

Just now, WebCMS said:

It downloaded in XML format. When I tar it on macOS and try to install -

1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it.

As stated in the file description, it’s a plugin

Link to comment
Share on other sites

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...