WebCMS Posted January 11 Posted January 11 (edited) On the Article detail page, there are 2 tabs for Reviews and Comments. Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates? There are rarely any reviews compared to comments and the ordering of these tabs is not optimal. Edited January 11 by WebCMS
Marc Posted January 11 Posted January 11 The only way in which to do this would be through customisation. There is no specific setting for this
Adriano Faria Posted January 11 Posted January 11 2 hours ago, WebCMS said: Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates? I may have a plugin for this matter. Will reply back later.
Adriano Faria Posted January 15 Posted January 15 On 1/11/2024 at 3:14 AM, WebCMS said: On the Article detail page, there are 2 tabs for Reviews and Comments. Is it possible to reposition the Comments tab first followed by Reviews tab without editing the templates? There are rarely any reviews compared to comments and the ordering of these tabs is not optimal. On 1/11/2024 at 6:05 AM, Adriano Faria said: I may have a plugin for this matter. Will reply back later. https://www.sosinvision.com.br/index.php?/file/307-pages-commentsreviews-tab-order/
WebCMS Posted January 17 Author Posted January 17 On 1/15/2024 at 5:33 AM, Adriano Faria said: https://www.sosinvision.com.br/index.php?/file/307-pages-commentsreviews-tab-order/ It downloaded in XML format. When I tar it on macOS and try to install - 1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it.
Adriano Faria Posted January 17 Posted January 17 Just now, WebCMS said: It downloaded in XML format. When I tar it on macOS and try to install - 1C133/K The application you uploaded cannot be installed because it is not a valid application, the archive is corrupt or the file and directory permissions in /applications do not allow it. As stated in the file description, it’s a plugin.
WebCMS Posted January 17 Author Posted January 17 1 hour ago, Adriano Faria said: As stated in the file description, it’s a plugin. Got it. Thanks. Installed the first plugin ever 😀 Adriano Faria 1
Recommended Posts